Call Us : +44 (0) 28 3752 6090      Email : info.ni@cross-group.org

Airbus Case Study

Project Description

The Challenge

The designated production areas are ISO Class 8 Cleanrooms, demanding stable and stringent temperature and humidity control, combined with operator comfort. Floor space in buildings A and B are identical, each 19,000m_ with a ceiling heights of 16m. Capital and lifecycle costs along with ease and speed of installation were key drivers for Airbus in their decision for the innovative, customised Sintra Pulsion® solution.

The Outcome

The Sintra Pulsion® is a unique high-induction solution that delivers tempered air across all the areas, ensuring maximum comfort for the operatives, with no draughts and homogenous temperature stability to ±0.8_C.

Project Details